Our Facilities
Our company is having all the required infrastructure to manufacture the products as per GMP requirement. Services including compressed air, refrigeration, electricity generation, purified water plant, distillation plant, ETP plants and boiler for steam generation are provided in the engineering block.
Production Capacity of 110kL
The ability to rapidly deploy and reconfigure manufacturing production capacity based on demand for goods.
- Hydrogenation – Up to 15kgs working pressure
- Cryo facility – Up to -140 degrees
- High Temperature facility – Up to 250 degrees
- Clean Rooms – 2
- Stability Chambers – 3
Others
The main function of quality control is to test and verify the product quality against the predefined standards.
- GMP Warehouse of 8000 sft
- Quality Control Labs with GC, HPLC and other systems
EQUIPMENT DETAILS
Equipment
|
Type
|
Capacity
|
Quantity
|
---|---|---|---|
Reactor
|
GLR
|
0.63 kL – 6.30 kl
|
11
|
Reactor
|
SSR
|
0.6 kL – 6 kL
|
14
|
Centrifuge
|
SS-316
|
48
|
4
|
Centrifuge
|
SS-316, HALAR
|
48
|
1
|
ANFD
|
SS-316
|
2 kL
|
2
|
RCVD
|
SS-316
|
600 L
|
1
|
VTD
|
SS-316
|
48 Trays
|
1
|
Tray Drier
|
SS-316
|
96 Trays
|
3
|
Shifter
|
SS-316
|
50-250 kg/hr
|
2
|
Multi-miller
|
SS-316
|
18 Inches
|
2
|
Storage Tank
|
2
|
10-25 kL
|
10
|
UTILITIES
Equipment
|
Type
|
---|---|
Boiler
|
2 Ton capacity
|
Hot Oil
|
600,000 kcal capacity
|
Hot Oil
|
200,000 kcal capacity
|
High vacuum
|
High vacuum set up with steam jets
|
Cooling Tower
|
500 TR capacity
|
Cooling Tower
|
300 TR capacity
|
+5 degree C Chilling Plant
|
60 TR
|
-10 degree C Chilling Plant
|
28 TR
|
-20 degree C Chilling Plant
|
20 TR
|
Nitrogen Plant
|
99.95% 25 nm3
|
Air Compressor
|
12.5 HP Air Compressor
|